Cargo transshipment

Cargo transshipment at the Port of Chornomorsk

A complete operating cycle: rolling stock positioning, weighing, vessel loading and preparation of shipping documents.

6,000 tdaily loading rate
20 daysstorage included in the rate
2cargo streamsexport grain and import cargo in big bags
Grain export

Handling schemes aligned with the actual cargo schedule

Direct handling reduces the number of operations. Cargo accumulation in storage allows the shipment to be assembled before vessel arrival.

Direct option · rail

Wagon → truck → vessel

Rail hopper wagonHopper
KRVM wagon discharge unitKRVM
Tipper truckTipper truck
Truck weighing on the weighbridgeTruck scales
Vessel at the terminalVessel
Direct option · road

Truck → vessel

Tipper truckTipper truck
Truck weighing on the weighbridgeTruck scales
Ship loading equipmentShip-loading equipment
Vessel at the terminalVessel
With storage · rail

Wagon → warehouse → vessel

Rail hopper wagonHopper
KRVM wagon discharge unitKRVM
Cargo accumulation warehouseWarehouse
Truck for internal cargo transferTruck
Vessel at the terminalVessel
With storage · road

Truck → warehouse → vessel

Tipper truckTipper truck
Truck weighing on the weighbridgeTruck scales
Cargo accumulation warehouseWarehouse
Vessel at the terminalVessel
Rail wagons near grain terminal
Included in the rate

Core operating package

  • loading and discharge operations;
  • use of port infrastructure;
  • warehouse preparation and cargo accumulation;
  • truck weighing;
  • wagon positioning and removal;
  • shipping documentation;
  • forwarding and information support.

Storage

  • The first 20 days are free of charge.
  • From day 21, storage is charged at the company’s current tariff.

Additional services

  • Installation of a wagon liner — charged at the applicable tariff.
  • Wagon preparation for loading — where required.
  • Wagon detention at the station — charged in accordance with JSC Ukrzaliznytsia tariffs.
Import

Discharge of cargo in big bags

We coordinate discharge from hold, crane operation, placement in storage and further dispatch by truck or wagon.

Technology schemes for big-bag imports: road delivery — hold, crane, warehouse, truck; rail delivery — hold, crane, warehouse, wagon.
The quotation should be clear before operations begin: what is included, when paid storage starts and which additional services are required for the shipment.
LIMA PORT SERVICE · operating principle

Send cargo parameters for a handling review

Cargo type, volume, packaging, inbound transport and estimated period.

Transshipment enquiry